The physical GPU-cloud atlas

Neocloud locations

Neocloud Map pins 126 GPU-cloud sites across 26 countries and 17 operators, from CoreWeave, Nebius, Lambda and Nscale to Crusoe, IREN and Vultr. 84 are operating today. Filter by city, delivered and planned MW and GPU platform, then open any site for its dated first-party source. Method & sources

Compare physical locations

Delivered MW is live or billing capacity; planned MW is the contracted or announced total. Each site page states the exact power scope and its source. Use Columns for GPU counts, cooling and evidence dates.

Applied Digital Delta Forge 1Applied DigitalBoyceUnited StatesInfrastructure developerUnder construction—3001Contracted critical IT load; hyperscaler unnamed.—2026-11-11
Applied Digital Polaris Forge 2Applied DigitalHarwoodUnited StatesInfrastructure developerUnder construction—2001Contracted critical IT load; hyperscaler unnamed.—2026-11-11
Core42 DallasCore42DallasUnited StatesGPU / AI deploymentOperational————2026-11-11
Core42 Lake MarinerCore42BarkerUnited StatesGPU / AI deploymentOperational601—Core42 production AI infrastructure after expansion; separate from Fluidstack leases.AMD Instinct MI300; additional NVIDIA and AMD infrastructure2026-11-11
Core42 MinneapolisCore42MinneapolisUnited StatesGPU / AI deploymentOperational————2026-11-11
Core42 StocktonCore42StocktonUnited StatesGPU / AI deploymentOperational————2026-11-11
Core42 SunnyvaleCore42SunnyvaleUnited StatesGPU / AI deploymentOperational————2026-11-11
CoreWeave ArasurCoreWeaveArasurSpainGPU / AI deploymentAnnounced—181Reported future lease allocation, not confirmed operating MW.—2026-11-11
CoreWeave at Bulk N01CoreWeaveVenneslaNorwayGPU / AI deploymentAnnounced———NVIDIA GB200 NVL722026-11-11
CoreWeave at DentonCoreWeaveDentonUnited StatesGPU / AI deploymentOperational26032603About 260 MW billing of 260 MW leased critical IT (Core Scientific, 5 Nov 2026).—2026-11-11
CoreWeave AustinCoreWeaveAustinUnited StatesGPU / AI deploymentOperational201201About 20 MW billing of 20 MW leased critical IT (Core Scientific, 5 Nov 2026).—2026-11-11
CoreWeave Barcelona Zona FrancaCoreWeaveBarcelonaSpainGPU / AI deploymentOperational151—15 MW facility capacity at the May 2025 inauguration.NVIDIA H2002026-11-11
CoreWeave Copenhagen DEN01CoreWeaveCopenhagenDenmarkGPU / AI deploymentOperational—22.51Planned IT capacity; majority online, exact delivered MW undisclosed.NVIDIA Blackwell2026-11-11
CoreWeave CrawleyCoreWeaveCrawleyUnited KingdomGPU / AI deploymentOperational———NVIDIA H2002026-11-11
CoreWeave DaltonCoreWeaveDaltonUnited StatesGPU / AI deploymentOperational7511751About 75 MW billing of 175 MW leased critical IT (Core Scientific, 5 Nov 2026).—2026-11-11
CoreWeave DouglasvilleCoreWeaveDouglasvilleUnited StatesGPU / AI deploymentAnnounced—91Announced allocation at each facility in the 2023 agreement.—2026-11-11
CoreWeave Ellendale Polaris Forge 1CoreWeaveEllendaleUnited StatesGPU / AI deploymentOperational17514001Contracted critical IT load across the campus; phased delivery.—2026-11-11
CoreWeave FalunCoreWeaveFalunSwedenGPU / AI deploymentAnnounced———NVIDIA Blackwell (announced cluster)2026-11-11
CoreWeave HeliosCoreWeaveAftonUnited StatesGPU / AI deploymentOperational1333—Phase I delivered critical IT load, in service at quarter end; 200 MW gross is a different measure.—2026-11-11
CoreWeave HillsboroCoreWeaveHillsboroUnited StatesGPU / AI deploymentAnnounced—91Announced allocation at each facility in the 2023 agreement.—2026-11-11
CoreWeave Kenilworth NEST 11CoreWeaveKenilworthUnited StatesGPU / AI deploymentUnder construction————2026-11-11
CoreWeave LancasterCoreWeaveLancasterUnited StatesGPU / AI deploymentAnnounced—1001Initial facility plan; potential expansion to 300 MW—2026-11-11
CoreWeave London DocklandsCoreWeaveLondonUnited KingdomGPU / AI deploymentOperational———NVIDIA H2002026-11-11
CoreWeave MarbleCoreWeaveMarbleUnited StatesGPU / AI deploymentOperational651651About 65 MW billing of 65 MW leased critical IT (Core Scientific, 5 Nov 2026).—2026-11-11
CoreWeave MuskogeeCoreWeaveMuskogeeUnited StatesGPU / AI deploymentOperational701701About 70 MW billing of 70 MW leased critical IT (Core Scientific, 5 Nov 2026).—2026-11-11
CoreWeave PlanoCoreWeavePlanoUnited StatesGPU / AI deploymentAnnounced————2026-11-11
CoreWeave Stockholm 4 SouthCoreWeaveStockholmSwedenGPU / AI deploymentOperational————2026-11-11
CoreWeave Stockholm second campusCoreWeaveStockholmSwedenGPU / AI deploymentAnnounced————2026-11-11
Crusoe Abilene MicrosoftCrusoeAbileneUnited StatesGPU / AI deploymentUnder construction—9001New dedicated campus with on-site power; not operating IT load.—2026-11-11
Crusoe Abilene StargateCrusoeAbileneUnited StatesGPU / AI deploymentOperational———NVIDIA GB2002026-11-11
Crusoe HoustonCrusoeHoustonUnited StatesGPU / AI deploymentOperational————2026-11-11
Crusoe Keflavik ICE02CrusoeKeflavikIcelandGPU / AI deploymentOperational———NVIDIA DGX GB200 NVL72 / Blackwell (expansion)2026-11-11
Crusoe SparksCrusoeSparksUnited StatesGPU / AI deploymentOperational————2026-11-11
Crusoe Tørdal DRA01CrusoeTørdalNorwayGPU / AI deploymentOperational121401Live IT capacity at DRA01.NVIDIA Vera Rubin NVL72 (DRA02 expansion planned for late 2027)2026-11-11
Crusoe Wyoming former projectCrusoe—United StatesHistorical projectWithdrawn / transferred————2026-11-11
Firmus / SMC LoyangFirmus / SMCSingaporeSingaporeGPU / AI deploymentOperational————2026-11-11
Firmus / SMC Media HubFirmus / SMCSingaporeSingaporeGPU / AI deploymentStatus unconfirmed—31Media Hub GPU AI factory design capacity.—2026-11-11
Firmus / SMC Southgate MelbourneFirmus / SMCMelbourneAustraliaGPU / AI deploymentOperational424—About 42 MW deployed when the Southgate partnership with CDC ended (W.Media, 6 Oct 2026).NVIDIA GB300 NVL722026-11-11
Firmus Wesley ValeFirmus / SMCWesley ValeAustraliaGPU / AI deploymentStatus unconfirmed————2026-11-11
Fluidstack Barber LakeFluidstackColorado CityUnited StatesGPU / AI deploymentUnder construction—1681Contracted critical IT load; delivery targeted September 2026 in the filing.—2026-11-11
Fluidstack Bosquel former proposalFluidstackBosquelFranceHistorical projectWithdrawn / transferred————2026-11-11
Fluidstack Lake MarinerFluidstackBarkerUnited StatesGPU / AI deploymentOperational————2026-11-11
G42 Abu Dhabi StargateG42Abu DhabiUnited Arab EmiratesGPU / AI deploymentUnder construction—1,0001Stargate UAE cluster under construction; distinct from the wider 5 GW technology campus.—2026-11-11
Hyperstack / NexGen MontrealHyperstack / NexGenMontrealCanadaGPU / AI deploymentOperational————2026-11-11
Hyperstack / NexGen NORWAY-1Hyperstack / NexGen—NorwayGPU / AI deploymentOperational————2026-11-11
Hyperstack / NexGen US-1Hyperstack / NexGen—United StatesGPU / AI deploymentOperational————2026-11-11
IREN Canal FlatsIRENCanal FlatsCanadaAI use unconfirmedStatus unconfirmed—301Existing campus power; GPU-specific portion undisclosed.—2026-11-11
IREN Childress Horizon 1IRENChildressUnited StatesGPU / AI deploymentOperational501—Horizon 1 critical IT load; excludes Horizon 2–4 and other campus usesNVIDIA GB300 NVL722026-11-11
IREN MackenzieIRENMackenzieCanadaGPU / AI deploymentOperational801—Approximately 80 MW total campus capacity as of 2025-12-31—2026-11-11
IREN Prince GeorgeIRENPrince GeorgeCanadaGPU / AI deploymentOperational501—Approximately 50 MW total campus capacity as of 2025-12-31—2026-11-11
IREN SweetwaterIRENSweetwaterUnited StatesGPU / AI deploymentUnder construction—2,0001Campus power under construction, not GPU IT load.—2026-11-11
Lambda Atlanta ATL02LambdaAtlantaUnited StatesGPU / AI deploymentOperational————2026-11-11
Lambda Chicago AI factoryLambdaChicagoUnited StatesGPU / AI deploymentUnder construction—231Planned single-tenant data center capacity; IT/gross split unspecified—2026-11-11
Lambda Kansas City AI factoryLambdaKansas CityUnited StatesGPU / AI deploymentStatus unconfirmed—241Announced launch capacity; not verified operating capacityNVIDIA Blackwell Ultra2026-11-11
Lambda Mountain View MV1LambdaMountain ViewUnited StatesGPU / AI deploymentOperational———NVIDIA GB300 NVL722026-11-11
Lambda Plano DFW-04LambdaPlanoUnited StatesGPU / AI deploymentUnder construction————2026-11-11
Lambda Vernon LAX01LambdaVernonUnited StatesGPU / AI deploymentOperational211—Initial Lambda lease allocation; not the full 33 MW facilityNVIDIA Blackwell2026-11-11
Nebius IndependenceNebiusIndependenceUnited StatesGPU / AI deploymentUnder construction—1,2001Up to 1.2 GW total campus ambition; not live power—2026-11-11
Nebius Kansas CityNebiusKansas CityUnited StatesGPU / AI deploymentOperational—403Initial 5 MW, expandable to 40 MW (Nebius, Nov 2024).NVIDIA H200; NVIDIA B2002026-11-11
Nebius Keflavik VerneNebiusKeflavikIcelandGPU / AI deploymentOperational101—Nebius cluster implementation; not Verne campus total.—2026-11-11
Nebius LappeenrantaNebiusLappeenrantaFinlandGPU / AI deploymentUnder construction—3101Up to 310 MW at full deployment; IT/gross not stated—2026-11-11
Nebius LondonNebiusLondonUnited KingdomGPU / AI deploymentAnnounced———NVIDIA Blackwell Ultra (contracted deployment)2026-11-11
Nebius MadridNebiusMadridSpainGPU / AI deploymentOperational———NVIDIA RTX PRO 60002026-11-11
Nebius MäntsäläNebiusMäntsäläFinlandGPU / AI deploymentOperational751—Expanded data center capacity; IT/gross distinction not statedNVIDIA GB300 NVL722026-11-11
Nebius near LilleNebiusLilleFranceGPU / AI deploymentUnder construction—2401240 MW when fully deployed; IT/gross not stated—2026-11-11
Nebius ParisNebiusParisFranceGPU / AI deploymentOperational————2026-11-11
Nebius VinelandNebiusVinelandUnited StatesGPU / AI deploymentOperational—3002Up to 300 MW phased design capacity (Nebius, March 2025).—2026-11-11
Nebius WoodburyNebiusWoodburyUnited StatesGPU / AI deploymentOperational———NVIDIA B300 NVLink2026-11-11
Nscale BlönduósNscaleBlönduósIcelandGPU / AI deploymentStatus unconfirmed————2026-11-11
Nscale Cobalt Park Stargate UKNscaleCobalt ParkUnited KingdomGPU / AI deploymentAnnounced————2026-11-11
Nscale GlomfjordNscaleGlomfjordNorwayGPU / AI deploymentOperational301—Operator-stated operational capacity; expandable to 60 MW; IT/gross split unspecified—2026-11-11
Nscale HayesNscaleHayesUnited KingdomGPU / AI deploymentStatus unconfirmed————2026-11-11
Nscale Keflavik / VerneNscaleKeflavikIcelandGPU / AI deploymentOperational7.541517.5 MW deployed in phase 1 of a 15 MW Nscale deployment.NVIDIA GB300 (Blackwell Ultra)2026-11-11
Nscale LoughtonNscaleLoughtonUnited KingdomGPU / AI deploymentStatus unconfirmed—901Maximum scalable power allocation; not delivered IT load.—2026-11-11
Nscale MadisonNscaleMadisonUnited StatesGPU / AI deploymentAnnounced—401Capacity expected online in 2026; 99 MW secured power is a separate scope.—2026-11-11
Nscale MonarchNscale—United StatesGPU / AI deploymentAnnounced—1,3501Phase 1 engineered AI capacity; target early 2028.—2026-11-11
Nscale Narvik / KvandalNscaleNarvikNorwayGPU / AI deploymentUnder construction—2301Planned campus capacity; not verified live IT powerNVIDIA Rubin (planned)2026-11-11
Nscale OsloNscaleOsloNorwayGPU / AI deploymentStatus unconfirmed————2026-11-11
Nscale Sines / Start CampusNscaleSinesPortugalGPU / AI deploymentOperational———NVIDIA Blackwell Ultra2026-11-11
Nscale StavangerNscaleStavangerNorwayGPU / AI deploymentStatus unconfirmed————2026-11-11
Nscale Ward CountyNscaleWard CountyUnited StatesGPU / AI deploymentOperational—2001Approximate IT load supported by financed deployment; not verified live drawNVIDIA GB300 and Vera Rubin VR200 (financed deployment)2026-11-11
Sesterce BosquelSesterceBosquelFranceGPU / AI deploymentAnnounced—1,0001Planned campus or first-phase capacity; no commissioning confirmation.—2026-11-11
Sesterce JämsäSesterceJämsäFinlandGPU / AI deploymentAnnounced—2001Planned campus or first-phase capacity; no commissioning confirmation.—2026-11-11
Sesterce ValenceSesterceValenceFranceGPU / AI deploymentAnnounced—401Planned campus or first-phase capacity; no commissioning confirmation.—2026-11-11
Together AI Maryland 5CTogether AI—United StatesGPU / AI deploymentOperational———NVIDIA B2002026-11-11
Together AI Memphis 5CTogether AIMemphisUnited StatesGPU / AI deploymentAnnounced———NVIDIA GB200 and GB300 (planned)2026-11-11
Voltage Park AllenVoltage ParkAllenUnited StatesGPU / AI deploymentOperational———NVIDIA H100 80 GB SXM52026-11-11
Voltage Park QuincyVoltage ParkQuincyUnited StatesGPU / AI deploymentOperational———NVIDIA H100 80 GB SXM52026-11-11
Vultr AmsterdamVultrAmsterdamNetherlandsGeneral cloud footprintOperational————2026-11-11
Vultr AtlantaVultrAtlantaUnited StatesGeneral cloud footprintOperational————2026-11-11
Vultr BangaloreVultrBangaloreIndiaGeneral cloud footprintOperational————2026-11-11
Vultr ChennaiVultrChennaiIndiaGPU / AI deploymentOperational201—Opening announcement supercluster power; scope not specified as IT or facility.AMD Instinct MI355X2026-11-11
Vultr ChicagoVultrChicagoUnited StatesGeneral cloud footprintOperational————2026-11-11
Vultr DallasVultrDallasUnited StatesGeneral cloud footprintOperational————2026-11-11
Vultr Delhi NCRVultrDelhi NCRIndiaGeneral cloud footprintOperational————2026-11-11
Vultr FrankfurtVultrFrankfurtGermanyGeneral cloud footprintOperational————2026-11-11
Vultr HonoluluVultrHonoluluUnited StatesGeneral cloud footprintOperational————2026-11-11
Vultr JohannesburgVultrJohannesburgSouth AfricaGeneral cloud footprintOperational————2026-11-11
Vultr LondonVultrLondonUnited KingdomGeneral cloud footprintOperational————2026-11-11
Vultr Los AngelesVultrLos AngelesUnited StatesGeneral cloud footprintOperational————2026-11-11
Vultr MadridVultrMadridSpainGeneral cloud footprintOperational————2026-11-11
Vultr ManchesterVultrManchesterUnited KingdomGeneral cloud footprintOperational————2026-11-11
Vultr MelbourneVultrMelbourneAustraliaGeneral cloud footprintOperational————2026-11-11
Vultr Mexico CityVultrMexico CityMexicoGeneral cloud footprintOperational————2026-11-11
Vultr MiamiVultrMiamiUnited StatesGeneral cloud footprintOperational————2026-11-11
Vultr MilanVultrMilanItalyGeneral cloud footprintOperational————2026-11-11
Vultr MumbaiVultrMumbaiIndiaGeneral cloud footprintOperational————2026-11-11
Vultr OsakaVultrOsakaJapanGeneral cloud footprintOperational————2026-11-11
Vultr ParisVultrParisFranceGeneral cloud footprintOperational————2026-11-11
Vultr PiscatawayVultrPiscatawayUnited StatesGeneral cloud footprintOperational————2026-11-11
Vultr San JoseVultrSan JoseUnited StatesGeneral cloud footprintOperational————2026-11-11
Vultr SantiagoVultrSantiagoChileGeneral cloud footprintOperational————2026-11-11
Vultr São PauloVultrSão PauloBrazilGeneral cloud footprintOperational————2026-11-11
Vultr SeattleVultrSeattleUnited StatesGeneral cloud footprintOperational————2026-11-11
Vultr SeoulVultrSeoulSouth KoreaGeneral cloud footprintOperational————2026-11-11
Vultr SingaporeVultrSingaporeSingaporeGeneral cloud footprintOperational————2026-11-11
Vultr SpringfieldVultrSpringfieldUnited StatesGPU / AI deploymentAnnounced—501Announced additional supercluster deployment; no commissioning confirmation in this release.AMD Instinct MI355X2026-11-11
Vultr StockholmVultrStockholmSwedenGeneral cloud footprintOperational————2026-11-11
Vultr SydneyVultrSydneyAustraliaGeneral cloud footprintOperational————2026-11-11
Vultr Tel AvivVultrTel AvivIsraelGeneral cloud footprintOperational————2026-11-11
Vultr TokyoVultrTokyoJapanGeneral cloud footprintOperational————2026-11-11
Vultr TorontoVultrTorontoCanadaGeneral cloud footprintOperational————2026-11-11
Vultr WarsawVultrWarsawPolandGeneral cloud footprintOperational————2026-11-11
Yotta D1 Shakti CloudYottaGreater NoidaIndiaGPU / AI deploymentOperational————2026-11-11
Yotta D2 BlackwellYottaGreater NoidaIndiaGPU / AI deploymentAnnounced—601D2 data center capacity; campus expansion is separate.NVIDIA Blackwell Ultra (planned)2026-11-11
Yotta NM1 Shakti CloudYottaNavi MumbaiIndiaGPU / AI deploymentOperational————2026-11-11

Map of neocloud locations

Positioning method

Pick a numbered pin to jump to its sites, then open any site file for power, GPUs and sources.

World

115 mapped sites
World neocloud locations. Numbered pins link to the location groups listed below. Applied Digital Delta Forge 1 — Boyce, Under construction; Core42 Dallas — Dallas, Operational; CoreWeave at Denton — Denton, Operational; CoreWeave Austin — Austin, Operational; CoreWeave Douglasville — Douglasville, Announced; CoreWeave Helios — Afton, Operational; CoreWeave Muskogee — Muskogee, Operational; CoreWeave Plano — Plano, Announced; Crusoe Abilene Microsoft — Abilene, Under construction; Crusoe Abilene Stargate — Abilene, Operational; Crusoe Houston — Houston, Operational; Fluidstack Barber Lake — Colorado City, Under construction; IREN Childress Horizon 1 — Childress, Operational; IREN Sweetwater — Sweetwater, Under construction; Lambda Atlanta ATL02 — Atlanta, Operational; Lambda Plano DFW-04 — Plano, Under construction; Together AI Memphis 5C — Memphis, Announced; Voltage Park Allen — Allen, Operational; Vultr Atlanta — Atlanta, Operational; Vultr Dallas — Dallas, Operational 1 Applied Digital Polaris Forge 2 — Harwood, Under construction; Core42 Minneapolis — Minneapolis, Operational; CoreWeave Ellendale Polaris Forge 1 — Ellendale, Operational; Nebius Woodbury — Woodbury, Operational 2 Core42 Lake Mariner — Barker, Operational; CoreWeave Kenilworth NEST 11 — Kenilworth, Under construction; CoreWeave Lancaster — Lancaster, Announced; Fluidstack Lake Mariner — Barker, Operational; Hyperstack / NexGen Montreal — Montreal, Operational; Nebius Vineland — Vineland, Operational; Vultr Piscataway — Piscataway, Operational; Vultr Springfield — Springfield, Announced; Vultr Toronto — Toronto, Operational 3 Core42 Stockton — Stockton, Operational; Core42 Sunnyvale — Sunnyvale, Operational; Crusoe Sparks — Sparks, Operational; Lambda Mountain View MV1 — Mountain View, Operational; Lambda Vernon LAX01 — Vernon, Operational; Vultr Los Angeles — Los Angeles, Operational; Vultr San Jose — San Jose, Operational 4 CoreWeave at Bulk N01 — Vennesla, Announced; CoreWeave Copenhagen DEN01 — Copenhagen, Operational; CoreWeave Falun — Falun, Announced; Nscale Oslo — Oslo, Status unconfirmed; Nscale Stavanger — Stavanger, Status unconfirmed 5 CoreWeave Barcelona Zona Franca — Barcelona, Operational; Nebius Madrid — Madrid, Operational; Sesterce Valence — Valence, Announced; Vultr Madrid — Madrid, Operational 6 CoreWeave Crawley — Crawley, Operational; CoreWeave London Docklands — London, Operational; Fluidstack Bosquel former proposal — Bosquel, Withdrawn / transferred; Nebius London — London, Announced; Nebius near Lille — Lille, Under construction; Nebius Paris — Paris, Operational; Nscale Hayes — Hayes, Status unconfirmed; Nscale Loughton — Loughton, Status unconfirmed; Sesterce Bosquel — Bosquel, Announced; Vultr Amsterdam — Amsterdam, Operational; Vultr Frankfurt — Frankfurt, Operational; Vultr London — London, Operational; Vultr Manchester — Manchester, Operational; Vultr Paris — Paris, Operational 7 CoreWeave Dalton — Dalton, Operational; CoreWeave Marble — Marble, Operational; Nscale Madison — Madison, Announced 8 CoreWeave Hillsboro — Hillsboro, Announced; Voltage Park Quincy — Quincy, Operational; Vultr Seattle — Seattle, Operational 9 CoreWeave Stockholm 4 South — Stockholm, Operational; CoreWeave Stockholm second campus — Stockholm, Announced; Nebius Mäntsälä — Mäntsälä, Operational; Sesterce Jämsä — Jämsä, Announced; Vultr Stockholm — Stockholm, Operational 10 Crusoe Keflavik ICE02 — Keflavik, Operational; Nebius Keflavik Verne — Keflavik, Operational; Nscale Blönduós — Blönduós, Status unconfirmed; Nscale Keflavik / Verne — Keflavik, Operational 11 Firmus / SMC Loyang — Singapore, Operational; Firmus / SMC Media Hub — Singapore, Status unconfirmed; Vultr Singapore — Singapore, Operational 12 Firmus / SMC Southgate Melbourne — Melbourne, Operational; Firmus Wesley Vale — Wesley Vale, Status unconfirmed; Vultr Melbourne — Melbourne, Operational; Vultr Sydney — Sydney, Operational 13 G42 Abu Dhabi Stargate — Abu Dhabi, Under construction 14 IREN Canal Flats — Canal Flats, Status unconfirmed; IREN Prince George — Prince George, Operational 15 IREN Mackenzie — Mackenzie, Operational 16 Lambda Chicago AI factory — Chicago, Under construction; Lambda Kansas City AI factory — Kansas City, Status unconfirmed; Nebius Independence — Independence, Under construction; Nebius Kansas City — Kansas City, Operational; Vultr Chicago — Chicago, Operational 17 Nebius Lappeenranta — Lappeenranta, Under construction 18 Nscale Glomfjord — Glomfjord, Operational; Nscale Narvik / Kvandal — Narvik, Under construction 19 Nscale Sines / Start Campus — Sines, Operational 20 Vultr Chennai — Chennai, Operational 21 Vultr Honolulu — Honolulu, Operational 22 Vultr Johannesburg — Johannesburg, Operational 23 Vultr Mexico City — Mexico City, Operational 24 Vultr Miami — Miami, Operational 25 Vultr Milan — Milan, Operational 26 Vultr Mumbai — Mumbai, Operational; Yotta NM1 Shakti Cloud — Navi Mumbai, Operational 27 Vultr Osaka — Osaka, Operational; Vultr Tokyo — Tokyo, Operational 28 Vultr Santiago — Santiago, Operational 29 Vultr São Paulo — São Paulo, Operational 30 Vultr Seoul — Seoul, Operational 31 Vultr Tel Aviv — Tel Aviv, Operational 32 Vultr Warsaw — Warsaw, Operational 33 Yotta D1 Shakti Cloud — Greater Noida, Operational; Yotta D2 Blackwell — Greater Noida, Announced 34
  1. Boyce / Dallas / Denton / Austin / Douglasville / Afton / Muskogee / Plano / Abilene / Houston / Colorado City / Childress / Sweetwater / Atlanta / Memphis / Allen Applied Digital Delta Forge 1Core42 DallasCoreWeave at DentonCoreWeave AustinCoreWeave DouglasvilleCoreWeave HeliosCoreWeave MuskogeeCoreWeave PlanoCrusoe Abilene MicrosoftCrusoe Abilene StargateCrusoe HoustonFluidstack Barber LakeIREN Childress Horizon 1IREN SweetwaterLambda Atlanta ATL02Lambda Plano DFW-04Together AI Memphis 5CVoltage Park AllenVultr AtlantaVultr Dallas
  2. Harwood / Minneapolis / Ellendale / Woodbury Applied Digital Polaris Forge 2Core42 MinneapolisCoreWeave Ellendale Polaris Forge 1Nebius Woodbury
  3. Barker / Kenilworth / Lancaster / Montreal / Vineland / Piscataway / Springfield / Toronto Core42 Lake MarinerCoreWeave Kenilworth NEST 11CoreWeave LancasterFluidstack Lake MarinerHyperstack / NexGen MontrealNebius VinelandVultr PiscatawayVultr SpringfieldVultr Toronto
  4. Stockton / Sunnyvale / Sparks / Mountain View / Vernon / Los Angeles / San Jose Core42 StocktonCore42 SunnyvaleCrusoe SparksLambda Mountain View MV1Lambda Vernon LAX01Vultr Los AngelesVultr San Jose
  5. Vennesla / Copenhagen / Falun / Oslo / Stavanger CoreWeave at Bulk N01CoreWeave Copenhagen DEN01CoreWeave FalunNscale OsloNscale Stavanger
  6. Barcelona / Madrid / Valence CoreWeave Barcelona Zona FrancaNebius MadridSesterce ValenceVultr Madrid
  7. Crawley / London / Bosquel / Lille / Paris / Hayes / Loughton / Amsterdam / Frankfurt / Manchester CoreWeave CrawleyCoreWeave London DocklandsFluidstack Bosquel former proposalNebius LondonNebius near LilleNebius ParisNscale HayesNscale LoughtonSesterce BosquelVultr AmsterdamVultr FrankfurtVultr LondonVultr ManchesterVultr Paris
  8. Dalton / Marble / Madison CoreWeave DaltonCoreWeave MarbleNscale Madison
  9. Hillsboro / Quincy / Seattle CoreWeave HillsboroVoltage Park QuincyVultr Seattle
  10. Stockholm / Mäntsälä / Jämsä CoreWeave Stockholm 4 SouthCoreWeave Stockholm second campusNebius MäntsäläSesterce JämsäVultr Stockholm
  11. Keflavik / Blönduós Crusoe Keflavik ICE02Nebius Keflavik VerneNscale BlönduósNscale Keflavik / Verne
  12. Singapore Firmus / SMC LoyangFirmus / SMC Media HubVultr Singapore
  13. Melbourne / Wesley Vale / Sydney Firmus / SMC Southgate MelbourneFirmus Wesley ValeVultr MelbourneVultr Sydney
  14. Abu Dhabi G42 Abu Dhabi Stargate
  15. Canal Flats / Prince George IREN Canal FlatsIREN Prince George
  16. Mackenzie IREN Mackenzie
  17. Chicago / Kansas City / Independence Lambda Chicago AI factoryLambda Kansas City AI factoryNebius IndependenceNebius Kansas CityVultr Chicago
  18. Lappeenranta Nebius Lappeenranta
  19. Glomfjord / Narvik Nscale GlomfjordNscale Narvik / Kvandal
  20. Sines Nscale Sines / Start Campus
  21. Chennai Vultr Chennai
  22. Honolulu Vultr Honolulu
  23. Johannesburg Vultr Johannesburg
  24. Mexico City Vultr Mexico City
  25. Miami Vultr Miami
  26. Milan Vultr Milan
  27. Mumbai / Navi Mumbai Vultr MumbaiYotta NM1 Shakti Cloud
  28. Osaka / Tokyo Vultr OsakaVultr Tokyo
  29. Santiago Vultr Santiago
  30. São Paulo Vultr São Paulo
  31. Seoul Vultr Seoul
  32. Tel Aviv Vultr Tel Aviv
  33. Warsaw Vultr Warsaw
  34. Greater Noida Yotta D1 Shakti CloudYotta D2 Blackwell

North America

55 mapped sites
North America neocloud locations. Numbered pins link to the location groups listed below. Applied Digital Delta Forge 1 — Boyce, Under construction 1 Applied Digital Polaris Forge 2 — Harwood, Under construction; CoreWeave Ellendale Polaris Forge 1 — Ellendale, Operational 2 Core42 Dallas — Dallas, Operational; CoreWeave at Denton — Denton, Operational; CoreWeave Plano — Plano, Announced; Lambda Plano DFW-04 — Plano, Under construction; Voltage Park Allen — Allen, Operational; Vultr Dallas — Dallas, Operational 3 Core42 Lake Mariner — Barker, Operational; Fluidstack Lake Mariner — Barker, Operational; Vultr Toronto — Toronto, Operational 4 Core42 Minneapolis — Minneapolis, Operational; Nebius Woodbury — Woodbury, Operational 5 Core42 Stockton — Stockton, Operational; Core42 Sunnyvale — Sunnyvale, Operational; Crusoe Sparks — Sparks, Operational; Lambda Mountain View MV1 — Mountain View, Operational; Vultr San Jose — San Jose, Operational 6 CoreWeave Austin — Austin, Operational 7 CoreWeave Dalton — Dalton, Operational; CoreWeave Douglasville — Douglasville, Announced; CoreWeave Marble — Marble, Operational; Lambda Atlanta ATL02 — Atlanta, Operational; Vultr Atlanta — Atlanta, Operational 8 CoreWeave Helios — Afton, Operational; Crusoe Abilene Microsoft — Abilene, Under construction; Crusoe Abilene Stargate — Abilene, Operational; Fluidstack Barber Lake — Colorado City, Under construction; IREN Childress Horizon 1 — Childress, Operational; IREN Sweetwater — Sweetwater, Under construction 9 CoreWeave Hillsboro — Hillsboro, Announced; Vultr Seattle — Seattle, Operational 10 CoreWeave Kenilworth NEST 11 — Kenilworth, Under construction; CoreWeave Lancaster — Lancaster, Announced; Nebius Vineland — Vineland, Operational; Vultr Piscataway — Piscataway, Operational 11 CoreWeave Muskogee — Muskogee, Operational 12 Crusoe Houston — Houston, Operational 13 Hyperstack / NexGen Montreal — Montreal, Operational 14 IREN Canal Flats — Canal Flats, Status unconfirmed 15 IREN Mackenzie — Mackenzie, Operational; IREN Prince George — Prince George, Operational 16 Lambda Chicago AI factory — Chicago, Under construction; Vultr Chicago — Chicago, Operational 17 Lambda Kansas City AI factory — Kansas City, Status unconfirmed; Nebius Independence — Independence, Under construction; Nebius Kansas City — Kansas City, Operational 18 Lambda Vernon LAX01 — Vernon, Operational; Vultr Los Angeles — Los Angeles, Operational 19 Nscale Madison — Madison, Announced 20 Together AI Memphis 5C — Memphis, Announced 21 Voltage Park Quincy — Quincy, Operational 22 Vultr Miami — Miami, Operational 23 Vultr Springfield — Springfield, Announced 24
  1. Boyce Applied Digital Delta Forge 1
  2. Harwood / Ellendale Applied Digital Polaris Forge 2CoreWeave Ellendale Polaris Forge 1
  3. Dallas / Denton / Plano / Allen Core42 DallasCoreWeave at DentonCoreWeave PlanoLambda Plano DFW-04Voltage Park AllenVultr Dallas
  4. Barker / Toronto Core42 Lake MarinerFluidstack Lake MarinerVultr Toronto
  5. Minneapolis / Woodbury Core42 MinneapolisNebius Woodbury
  6. Stockton / Sunnyvale / Sparks / Mountain View / San Jose Core42 StocktonCore42 SunnyvaleCrusoe SparksLambda Mountain View MV1Vultr San Jose
  7. Austin CoreWeave Austin
  8. Dalton / Douglasville / Marble / Atlanta CoreWeave DaltonCoreWeave DouglasvilleCoreWeave MarbleLambda Atlanta ATL02Vultr Atlanta
  9. Afton / Abilene / Colorado City / Childress / Sweetwater CoreWeave HeliosCrusoe Abilene MicrosoftCrusoe Abilene StargateFluidstack Barber LakeIREN Childress Horizon 1IREN Sweetwater
  10. Hillsboro / Seattle CoreWeave HillsboroVultr Seattle
  11. Kenilworth / Lancaster / Vineland / Piscataway CoreWeave Kenilworth NEST 11CoreWeave LancasterNebius VinelandVultr Piscataway
  12. Muskogee CoreWeave Muskogee
  13. Houston Crusoe Houston
  14. Montreal Hyperstack / NexGen Montreal
  15. Canal Flats IREN Canal Flats
  16. Mackenzie / Prince George IREN MackenzieIREN Prince George
  17. Chicago Lambda Chicago AI factoryVultr Chicago
  18. Kansas City / Independence Lambda Kansas City AI factoryNebius IndependenceNebius Kansas City
  19. Vernon / Los Angeles Lambda Vernon LAX01Vultr Los Angeles
  20. Madison Nscale Madison
  21. Memphis Together AI Memphis 5C
  22. Quincy Voltage Park Quincy
  23. Miami Vultr Miami
  24. Springfield Vultr Springfield

Europe

38 mapped sites
Europe neocloud locations. Numbered pins link to the location groups listed below. CoreWeave at Bulk N01 — Vennesla, Announced 1 CoreWeave Barcelona Zona Franca — Barcelona, Operational 2 CoreWeave Copenhagen DEN01 — Copenhagen, Operational 3 CoreWeave Crawley — Crawley, Operational; CoreWeave London Docklands — London, Operational; Nebius London — London, Announced; Nscale Hayes — Hayes, Status unconfirmed; Nscale Loughton — Loughton, Status unconfirmed; Vultr London — London, Operational 4 CoreWeave Falun — Falun, Announced 5 CoreWeave Stockholm 4 South — Stockholm, Operational; CoreWeave Stockholm second campus — Stockholm, Announced; Vultr Stockholm — Stockholm, Operational 6 Crusoe Keflavik ICE02 — Keflavik, Operational; Nebius Keflavik Verne — Keflavik, Operational; Nscale Keflavik / Verne — Keflavik, Operational 7 Fluidstack Bosquel former proposal — Bosquel, Withdrawn / transferred; Nebius near Lille — Lille, Under construction; Nebius Paris — Paris, Operational; Sesterce Bosquel — Bosquel, Announced; Vultr Paris — Paris, Operational 8 Nebius Lappeenranta — Lappeenranta, Under construction 9 Nebius Madrid — Madrid, Operational; Vultr Madrid — Madrid, Operational 10 Nebius Mäntsälä — Mäntsälä, Operational; Sesterce Jämsä — Jämsä, Announced 11 Nscale Blönduós — Blönduós, Status unconfirmed 12 Nscale Glomfjord — Glomfjord, Operational 13 Nscale Narvik / Kvandal — Narvik, Under construction 14 Nscale Oslo — Oslo, Status unconfirmed 15 Nscale Sines / Start Campus — Sines, Operational 16 Nscale Stavanger — Stavanger, Status unconfirmed 17 Sesterce Valence — Valence, Announced 18 Vultr Amsterdam — Amsterdam, Operational 19 Vultr Frankfurt — Frankfurt, Operational 20 Vultr Manchester — Manchester, Operational 21 Vultr Milan — Milan, Operational 22 Vultr Warsaw — Warsaw, Operational 23
  1. Vennesla CoreWeave at Bulk N01
  2. Barcelona CoreWeave Barcelona Zona Franca
  3. Copenhagen CoreWeave Copenhagen DEN01
  4. Crawley / London / Hayes / Loughton CoreWeave CrawleyCoreWeave London DocklandsNebius LondonNscale HayesNscale LoughtonVultr London
  5. Falun CoreWeave Falun
  6. Stockholm CoreWeave Stockholm 4 SouthCoreWeave Stockholm second campusVultr Stockholm
  7. Keflavik Crusoe Keflavik ICE02Nebius Keflavik VerneNscale Keflavik / Verne
  8. Bosquel / Lille / Paris Fluidstack Bosquel former proposalNebius near LilleNebius ParisSesterce BosquelVultr Paris
  9. Lappeenranta Nebius Lappeenranta
  10. Madrid Nebius MadridVultr Madrid
  11. Mäntsälä / Jämsä Nebius MäntsäläSesterce Jämsä
  12. Blönduós Nscale Blönduós
  13. Glomfjord Nscale Glomfjord
  14. Narvik Nscale Narvik / Kvandal
  15. Oslo Nscale Oslo
  16. Sines Nscale Sines / Start Campus
  17. Stavanger Nscale Stavanger
  18. Valence Sesterce Valence
  19. Amsterdam Vultr Amsterdam
  20. Frankfurt Vultr Frankfurt
  21. Manchester Vultr Manchester
  22. Milan Vultr Milan
  23. Warsaw Vultr Warsaw

In the table, without a verified locality pin: CoreWeave Arasur, Crusoe Tørdal DRA01, Crusoe Wyoming former project, Hyperstack / NexGen NORWAY-1, Hyperstack / NexGen US-1, Nscale Cobalt Park Stargate UK, Nscale Monarch, Nscale Ward County, Together AI Maryland 5C, Vultr Bangalore, Vultr Delhi NCR.

Locality centers, not facility addresses. Nearby localities share a numbered group; pin sizes do not encode capacity. The world map covers all verified locality pins; regional plates enlarge North America and Europe. Maps are built into the HTML and remain independent of table filters. Land: Natural Earth, public domain. Positions: Open-Meteo / GeoNames, locality source links in each record.

Start with your deployment constraint

Neocloud sites by country

Count source: dataset

Neocloud sites by operator

Coverage limits

Field notes / public evidence

A location is only useful with its scope.

We read operator pages, hosting partners’ specifications and filings. Each record links individual fields to their evidence and separates the date of the statement from the date we checked it.

A site turns Operational when the operator, its landlord or a filing reports it live. GPU counts and MW are tied to the site they describe, never spread from a company-wide total.

Read the collection method · About the publisher

Illustrated atlas plate. The numbered maps above use sourced locality coordinates.

Questions about neocloud locations

What is a neocloud location?

A physical data center where a specialist GPU cloud such as CoreWeave, Nebius, Lambda, Nscale or Crusoe runs or is building capacity. Each record names the city, the host or partner, power and GPU platform where published, and the source behind every value.

What do delivered MW and planned MW mean?

Delivered MW is capacity the operator, its landlord or a filing reports as live or billing. Planned MW is the contracted or announced total and can include delivered phases. The power basis beside each value states its exact scope, so you compare like with like.

How precise are the map pins?

Each pin sits on the GeoNames center of the named city, so it shows the metro rather than the building. Nearby cities share one numbered pin, and the list under each map names every site in the group.

Can I buy GPU capacity at these sites?

Yes, at most of them. Operators sell on-demand, reserved and dedicated capacity from these locations, and some halls are built for a single customer such as Microsoft or OpenAI. Use Request a quote on any site page to reach operators with capacity in that region.

Why are some cells empty?

A cell fills only when a public source gives a figure for that specific site. Provider-wide fleets are never split across locations, so every number on the map traces back to a source for that place.